I think most other organizations have a lot more bureaucracy involved in making changes, which makes them slower and more expensive.
Plus, SpaceX doesn't try to spread out its operations across the US to act like a jobs program, while the other big space contractors have advertised their presence in every state as a reason they should be picked, which obviously increases costs.
So when someone comes along that optimizes on cost and velocity and eschews cost plus contracts, that can be very difficult to deal with.
Also, as other people have mentioned, they pretty clearly do have exceptional tech - they routinely land orbital class boosters which has only been done with prototype rockets (it's very different landing when you can hover vs when you can't). And Raptor and Merlin are among the best rocket engines that have ever been made.
And even more impressive than specific components is their production and operational expertise. Being able to launch so many rockets flawlessly is a truly astounding feat. In a couple of years, Falcon 9 might even beat out the RD-108/107's total accumulated flight time record, which I thought wouldn't happen for a very long time.
Edit: for context, the RD-108/107 are the engines used on the Soyuz, which (as a family) has a truly astounding number of flights. To be fair to SpaceX, though, Soyuz accumulated those over many decades.
Well to be fair, there’s a lot of technology at spacex no one else has. One example, the Raptor engine’s combination of size, efficiency, and thrust is just not available to anyone other than SpaceX. Even if exact schematics were stolen you’d still need to obtain the recipes for the alloys used and how to manufacture them. Companies gave up on full flow staged combustion as just not feasible but SpaceX figured it out and is on v3 of perfecting it.
What's happening is that other companies are slow to wake up and adapt.