The Flint water crisis was a cock-up by the water utility that resulted in loss of pacification and leeching of lead, but that a mistake that can be prevented.
Seems like regular water testing (already done) is a reasonable solution. I could see decommissioning of lead pipes (i.e. an work done needs to replace them) but a wholesale "removal all lead pipe whether or not they contribute to lead exposure" seems like overkill.