In America, it is rare for homes to be ever torn down unless they're extremely damaged by termites, very old and not up to modern codes and not considered a historical site, or a 1-wall demo "remodel" cannot be accomplished.
I have never seen this. It seems trivial for an inspector to catch, and 2x4s are cheap. It makes no sense for a tract builder, whose profits are a function of successfully pumping out a new house in 100 days, to take such a low reward high risk action and end up delaying the build time.
This seems location and builder specific, and not at all generalizable based on a single anecdote.
> In America, it is rare for homes to be ever torn down unless they're extremely damaged by termites, very old and not up to modern codes and not considered a historical site, or a 1-wall demo "remodel" cannot be accomplished.
This, too, seems location-specific. In Denver, older houses are being torn down constantly to put up new builds. I’m not clear why you’d think it’s universally true.
QC issues are on the buyer, which is why it's standard to have an inspection done.
Many buildings never get inspected at all. Or, if they do get inspected, it's by someone who wants to spend 1% of the time there compared to what they should be spending, so they just don't bother with doing most of their job. Or they're being paid by the builder to look the other way.
Building codes are the sort of thing you worry about if you're not an actual home builder, and you think that the inspector is actually going to do their job.
Most buildings never come within a mile of an actual engineer. Or architect.
Now, if it's a high end home where they really want to make sure that they follow all the laws and regulations, they might actually hire an engineer and be able to figure out that they can safely do 24 OC studs in certain circumstances. But that's not even 1/10th of 1% of homes that are built.
First time, huh... [1]
I was a residential contractor for enough years to have witnessed several instances of "inspector on-site for just a few minutes, didn't even cross the treshhold" [usually to my benefit].
In my local AHJ, inspectors have just 30 minutes for each permitted project... and majority of <$10k projects "off the books."
As the old roofing joke goes: "warranty runs out; water runs in."
1960s house with aluminum wiring here.
Bare minimum you must do when buying such a house is to recheck every wirenut in every box.
Replace all wirenuts with zinc-based lugnut if any copper wire touches aluminum wire. The Bare minimum effort.
No time? Invest in cheap ($60) 32x32 pixel infrared sensor and look for a heat producing wiring box. This one caught one that completely melted the wiring conductors.