Don't think you have any idea how complex it is to both set up the fabs and run them. Are you gonna fly half of Taiwan to run these fabs here? How long do you think this process is going to take?
Don't think you have any idea how complex it is to both set up the fabs and run them. Are you gonna fly half of Taiwan to run these fabs here? How long do you think this process is going to take?
I would think this would all happen the same way it would happen if we lured the companies here with €30 billion.
Data centers already work that way - the economic value of the physical building is quite small because all the actual moneymaking can be done by an office full of software engineers in san Fransisco.
It's time to stop talking about things you don't know anything about.
Comparing a server to an ASML litography machine...
> Taiwan Semiconductor Manufacturing Company (TSMC) was supposed to have its first Arizona chip factory operational by late 2024 but now has confirmed significant delays. Primarily due to a shortage of technical workers with critical expertise in the US, TSMC projects to finish construction instead by 2025.
https://arstechnica.com/tech-policy/2023/07/tsmc-delays-us-c...