Prince Edward Island is connected to the mainland with a two-lane 13.6 km bridge. There are designated times over the course of the day when the bridge is closed to traffic and oversized loads are transferred across.
Several deliveries are usually staged one after the other, so you get to see a variety of loads if you are unlucky enough to have to wait for 30-40 minutes. Most of the time, it’s pre-fab buildings and nothing too exciting.