1) are the raw materials the same raw materials? (Iron is easier to get than tungsten for instance). Are the materials used in either type of generation actually hard to find or in danger of becoming scarce?
2) How much extra energy is spent on processing the raw materials to the finished product? The vast majority of weight in a turbine is the tower, which is relatively simple to build compared to the thousands of miles of piping welded together in a nuke plant. Even if weight of resources/watt of generation was a good measure, you are not factoring the weight of a) fuel to create energy consumed in manufacture, and b) weight of wasted resources in the refining and manufacture processes.
3) How reusable is the material base? How much of a nuke plant can be used to create the next plant? Presumably a wind down can have it's turbine or airfoils replaced independently of the tower structure itself, reducing tco. (and total resource consumption).
4) Your analysis is not including weight of energy production fuel put in, nor the weight of all resources needed for dealing with post energy production waste (not insignificant in nuclear waste storage).