Obviously doing this today would be a much more complicated affair, considering the much higher speeds and weights of contemporary trains.
http://southern.railfan.net/ties/1966/66-8/gauge.html
Obviously doing this today would be a much more complicated affair, considering the much higher speeds and weights of contemporary trains.
German soldiers re-gauged Soviet railways on a very short notice too when Barbarossa started.
https://www.google.com/url?sa=i&url=https%3A%2F%2Fwww.dayaen...
As you can see, the entire shape of the sleeper is adapted to the expected distance between rails.
In contrast, a wooden sleeper is just a straight log with no pre-made bumps for rails.
As the Finns will presumably not permit Russia to do prep work on the rails in advance of their invasion, they'll have to do all that prep work after the invasion. The article doesn't say how long that two years of prep would actually take if needed ASAP, but if it would take a month then the Finns would have a huge boon.
I could personally switch a track guage - but it would be multiple days per km of track switched, if you trained me on how to do this I could do it much faster (I have no idea how much faster, but faster). Train a lot of people like me and it is faster. Or you could buy machines.
We also need to switch all the train wheels, again, not hard - but not something an untrained person can do quickly.
Most likely a large part of the process is finding other railroads around the world that have the needed equipment that will let them borrow it for a few months (most of which time spent in shipping not using the machines.) there are a lot of railroads with old machines they keep for emergency use that can be pressed into use. There are railroads thinking about buying a new machine that would make the order now (with the options Finland needs) if Finland contributes on the understanding Finland gets it for a few months...
I have this feeling that Finland's railway tracks are not set in concrete at street level ;)
I imagine running a machine in reverse, removing the track and changing sleepers and one moving forward at the same time installing the new track only. Or have one remove the old sleepers and track and and another one installing new sleepers and track (imagine building new track kind of operation).
So repeats of the famous 19th century gauge change by converting large swathes of the network in just a few days (thousands of miles of track as in the US in 1886, or even just the 177 miles west of Exeter in the UK in 1892) remain rather unlikely.
Getting to the sleepers would take weeks of jackhammering plus more time to repour the concrete.