Construction on New York's Tunnel #3 began in 1970. It was 28 years before any part of it was operational. A second section came online 15 years later (2013). The final stage isn't expected to be completed until 2032, a full 62 years after construction began. I'm unaware of any comparable tunnel project which has progressed at this slow of a pace.
It's similar in scope to this recently-completed second phase of NYC Tunnel #3, albeit carrying sewage rather than fresh water: 25 km long, 7.2 m in diameter in London vs 29 km long, 4.9 m diameter in NYC. Flow volumes are likely similar (a sewage tunnel will rarely run full).
Planning started in 2001, with construction beginning in 2016. It opened in May 2025, at a cost of around £5bn: https://en.wikipedia.org/wiki/Thames_Tideway_Tunnel