For the $231B you ought to be able to get 2-3000 miles of tunnel done (3x what is proposed on the surface). Of course the stations are still a huge cost, because those have to be above ground, but you could choose where to put them. The bridges and aqueducts that have been built so far (Bakersfield to Merced) are intentionally where land costs are low and no one will ride them.
I agree, this isn't about figuring out how to build high-speed rail for riders. This is about figuring out how to extract maximum funds from tax/rate payers. It's just like PG&E. I'd go as far as to say that all the consultants and construction companies that have been paid should be banned from future public infrastructure builds unless the money spent is paid back.
And I WANT highspeed rail.
The US can't build anything efficiently. It's due to the massive mismanagement, bureaucratic nonsense, environmental review, permitting and NIMBY lawsuits.
The real conspiracy is that "they" never wanted a train, "they" wanted an endless jobs project.
This is the only actual difference between the US and other places
Take Los Angeles, the Santa Monica train slows down around a stop called farmdale because some whiner ran a bogus fear mongering campaign in 2011. I was at those meetings nobody liked this guy.
15 years later every trip, every day is still delayed because of this one man's stupid bitchfest