As I thought.
So you claim as representative, not the average and not the median of nuclear power plants.
But the most expensive nuclear power plants ever produced.
Even without knowing any details about those plants, that's either statistical illiteracy or malpractice. Take your pick.
And it doesn't get better when you know the details:
- The ones you picked were all First of a Kind build (FOAK). So prototypes. It is well-documented that FOAK builds typically are 50% more expensive and longer to build than serialized builds (Nth of a Kind, NOAK). These were more around 100% longer than NOAK, for a bunch of reasons.
- A number of these were the EPR. The EPR has since been discontinued, because the manufacturer found it too hard to build. It has been replaced by the highly simplified EPR2. How is a discontinued reactor type representative of future builds?
- All of these builds were in countries that had a long hiatus in nuclear construction, so had to build up experience in the workforce, supply chain and regulators, so FOAK on steroids. Even the most experienced, France, had a gap of 18 years between the start of the previous build and the start of FV3.
- All of these builds had regulatory changes during the construction process. Sometimes massive changes, for example over 4000 changes for HPC in the UK. And not trivial things: the concrete of the outer protective shell had to be increased by 40% or something. Which has knock-on effects, because now things inside don't quite fit any longer. etc.
- New construction techniques such as modularization, factory production etc. all decrease the cost of serialized builds, but vastly increase the risk during First of a Kind builds.
And of course you are comparing installed capacity, which is an almost completely irrelevant metric. In the UK, capacity factors for solar are between 9-12%. So you have to multiply your solar numbers by 10 just to get equivalent output on average. Except average is not good enough. There is winter, there is night, there are clouds. 4h of battery are not going to get you through winter.
And you "forgot" that nuclear power plants last much, much longer than solar installations, at least twice as long, more likely 3 times and possibly 4 times. All of the plants in the US that have applied have been approved for 80 years of operations, they are now looking at 100 years and see no significant problems.
So without even taking into account new developments, you have to divide the nuclear numbers you gave by 2 and multiply the numbers for PV you gave by at least 20-80 (and that's not covering winter yet).
So $8B/GW vs. $20-80B/GW without any firming.
And which is why the price for installed capacity is not the right metric at all.
The cost of a kWh delivered reliably 24/7 is the right metric. And there nuclear shines.
And intermittents are simply not up to the job. Which is why pretty much the entire world is giving up on the fantasy of supplying an advanced industrial society using only intermittent renewables. And even the most hard-core anti-nuclear greens are coming around, as TFA reports.
As I wrote: Germany's nuclear power plants delivered reliable electricity at below 2 cents per kWh.