The Prelude has had a lot of Australian engineering input but based on my experience working on the maintenance side with other FPSOs (especially those of Korean and Singaporan manufacture) there will be a lot of headaches with the Prelude.
Integrity control is at the top of the list for the Prelude design, but this may go the way of the Gorgon Project in terms of budget once they get it to the field. Last I heard there are still some issues with the field development side of things so even if they finish the vessel in time, it may be a while before production is able to go.