Technically: sure. But I think you are touching some different skill sets going on a continuum from (1) 'sequential simulations on regular machine' to (2) 'parallel simulation on very high end, regular machine', all the way to (3) 'massively parallel on non-regular machine'. From (1) to (2) you can manage with existing staff and limited time. From (2) to (3) is quite the change in mindset, training et cetera.