http://www.mercurynews.com/2017/02/17/oroville-dam-what-made...
The article also explains that cavitation caused the concrete to fail.
That is surprisingly thin. Plenty of concrete surface that you walk (not drive) on every single day is 6 or even 8 inches thick.
I'm sure it's within spec and built to fulfill their design, etc., but ... I would hardly call it "burly".
https://m.youtube.com/watch?v=v98omCq1kRA
http://www.popsci.com/scitech/article/2003-03/water-vapor-al...
Things that work on a laptop with the dev server don't work at scale, and you won't even understand the problems till you've had some theory/experience with the problems that scale adds.
You can land an A380 on a runway 17" thick...
This was definitely strong enough, just not ready to withstand cavitation and given that bronze ship screws suffer from it it is hard to see what kind of liner would have solved this problem entirely.
Solving it completely may ask for a totally different design, likely not a different material or thicker concrete.
Here's a more recent photo with humans standing near the broken concrete. You can see how massive that structure actually is (was?).
http://www.mercurynews.com/wp-content/uploads/2017/03/damage...
Here is one wit people for scale:
There's a bunch of great pictures on imgur with "humans for scale" https://imgur.com/gallery/mpUge
There's probably 20 Hoffman-crew-sized rented vehicles, and subcontracted employees and value-add diesel fuel ain't cheap either. It's going to take probably 9 months, at a minimum.