So making $40/MWH * 100 MWH/day = $4000 per day * 365 day/yr = 1.4 million revenue per year. Not enough to pay back $100 million.
Like you said The economics of it keep improving though Imp
330 karma · joined June 1, 2023
So making $40/MWH * 100 MWH/day = $4000 per day * 365 day/yr = 1.4 million revenue per year. Not enough to pay back $100 million.
Like you said The economics of it keep improving though Imp
The point of the studies is to determine the upgrades required to the transmission system to ensure stability and reliability (prevent cascading failures)
The study might show that the upgrades required to inject power at a project location and maintain system stability and reliability are too costly and the project can’t proceed as proposed.
The studies are usually performed in the order that the requests are received.
Project proponents are often unaware of where on the grid the most cost effective interconnections are for a given project size.
The feedback loop between proponents and utility could be tightened up if the utility would publish a map showing available capacity or cost to upgrade vs new capacity for different locations on the grid.
That is one way the utility could meet the demand to perform the studies faster with the same number of quants.
In my view, 33% of annual peak is not weakly interconnected. Granted that number is from 2003.
I work on hydro electric plant control systems not transmission planning so I can’t say what industry insiders would call weakly interconnected, but on the systems I have worked on one or two ties is weakly interconnected and dozens is not.
https://www.electricpowergroup.com/Downloads/pFinalCAElecGen...
I used to have a plug-in that did burn down charts but it depended on flash and doesn’t work anymore
The interface works, I don’t mind it. It allows export of data easily, and pdf generation.
I wish redmine’s website for showing users what plugins exist and are up to date was a bit better. Plug-ins always seem to fall in to disrepair, and can make upgrades difficult.
I am running it through docker on my synology nas.
A lot of the mowers etc are turning over to electric so the cacaphony of weekend 2 strikes is fading away
The airport or hospital will procure transformers that have the same winding configuration and impedance so the phase shift and voltage drop across them will also be the same. The low voltage windings of the transformers at the hospital can be paralleled so they both feed the load. Reverse power protection would be implemented so the hospital can’t back feed the distribution line.
What phase difference do you expect in this case? What effect would it have?