389 karma · joined March 7, 2012
Once I wrapped my head around that it helped somewhat.
edit: they're hiring for a composite tank engineer so there's some hope yet - although I hope whomever they get understands the issues of composites in cyclical high pressure service - most of industry shies away from composites due to their failure mode: most don't fail 'gently' - a catastrophic failure is the usual planning mode around composites.
edit: It's actually the low voltage corrosion cells that you need to be cognizant of in such a case - most high voltage shorts fail before significant corrosion has taken place. Consumption rates for steel are in the kg/A-yr scale, and the concentration of the current dump is a major factor in general vs acute/pitting corrosion activity.
The logistics involved with Uranium separation on an industrial scale simply were impossible during the second half of WW2 for the Nazis - they did not have the materials or the expertise to construct enrichment / separation plants.
The theory nor materials were there to produce a Plutonium device either - no critical pile of any significant size was made, and as far as I know the understanding that a much smaller critical mass of Plutonium was needed was missed entirely as well.
The Nazi bomb program is a great example of the effects of a Scientific embargo - all of the powers at be at WW2 knew the US and UK were up to something involving radiation as most of the leading scientists in the field stopped publishing in the late 1930's until the conclusion of the war.
An interesting read on the subject is Heisenberg's War - http://www.amazon.com/Heisenbergs-War-Secret-History-German/...
It was more economical to build the world's largest vessel and develop a lot of new technology than to deal with the issues involved with an onshore facility - interpret that however you'd like.
The Prelude has had a lot of Australian engineering input but based on my experience working on the maintenance side with other FPSOs (especially those of Korean and Singaporan manufacture) there will be a lot of headaches with the Prelude.
Integrity control is at the top of the list for the Prelude design, but this may go the way of the Gorgon Project in terms of budget once they get it to the field. Last I heard there are still some issues with the field development side of things so even if they finish the vessel in time, it may be a while before production is able to go.
1) Most of the pay in welding comes from contract jobs. When looking at salaried/shop welders, you're looking more in the range of $50k-$100k USD/year. When the welders are on contracts, they're typically on 4 week on / 1 week off rotations or further out (6/2 and 8/2 are not unusual).
2) When the welders are on contract work and on rotation, they'll be working 12 hours/day, every day, on them, or that's how the pay agreements work out. So 84 hour weeks, and you're not paid for your off rotation.
3) This works to annual work of roughly 3500 hours. At $150k, assuming they're paid straight time (many do get overtime but I don't feel like doing the math), the hourly rate works out to $42 / hour, which is not that great (it's not terrible either).
Many do make more than $150k, however some are on elevated pay for hazard rate (subsea work, politically unstable areas, etc), and other have additional modifiers (hot bunking adds $250/day in some cases). Keep in mind as well that most of this work goes on in fairly horrible places (deserts, jungles, subsea), and they welders are spending weeks if not months away from not only their families, but often any communication to the outside world. The pay is there for a reason.
Note: On many vessels and offshore platforms there's extremely limited bandwidth for personal use, often just a 256k satellite connection of which at least half is used for operations. So that's 128k-256k between 16-40 people who can only use devices for 2-3 hours a day.
Ask away with further questions, I'm a corrosion and materials engineer who works in conjunction with a lot of welders and others on contract projects.
My only wish was that Lego would start selling 'engineering' sets for those of us that grew up with them to use for prototyping - I got through a few hairy sessions in college using the tub I'd kept from when I was younger, but with the sets these days there's a lot of stuff you don't need. Something like the fischertechnik toys but with lego's distribution and selection of parts. Alas.
A lot of us western expats have headed to greener shores; the oil boom in Azerbaijan is one draw, a lot of the build-up in Qatar at the gas fields is another, and Western Australia is also helping things along quite a bit.
Wage rates for expats have fallen through the floor in the middle east as well - where one once could make a king's ransom in a year or two in the sand trap, now it's not so much the case, even in Saudi Arabia.