88 karma · joined June 4, 2022
But many people think this way instead: we have the technology for all the parts => build all the good stuff right now
Ironically, nuclear is selectively framed as just one thing with every safety issue ever, while fossils are further sub-divided into different environmental impacts.
It's not speed vs speed. It's speed vs forecasted capacity.
1. Continue to back up with fossil fuels
2. Temporarily back up with nuclear
Check my comment history for a debate on nuclear safety.
Modern technology often requires tighter integration. We accept integrated circuits because we're accustomed to them. But then people flip out when they see what's effectively a naked module because it looks like a greedy version of the old thing.
Reporting power is easy with the power triangle. It's a mathematically exact concept.
Measuring power is a different story. Distortions of the assumed perfect sine wave create measurement errors. Meter bandwidth matters, but most have low bandwidth.
Grid meters at least use voltage phase, if not magnitude. Residential customers are billed only for real power, so the phase information is necessary to exclude the reactive power from the measurement.
One rating is for maximum output. The other describes a short-circuit that you can create with an overly reactive load.
The degrees of freedom complicate the implementation, but the bottom-line discussion abstracts away those details.
1. Why would you verify local need, if the need is national?
2. Why would you verify inability to pay with ability to pay?
Spain's demographic problems are exacerbated by lack of rail access to certain areas. Portugal faces similar issues. If they want a strategic rail line, why would they apply the unrelated criteria you propose?
Being out-of-phase is like turning a crank with one hand while resisting with the other - wasted effort. Some of the VA becomes VAR instead of W.
The math thing is a simplification so you can take measurements with a multimeter, and do just a bit of arithmetic to get all three power values. It comes from the average power integral of trig functions with complex numbers.
Watt rating is what you'd expect. Voltage and current are working together to do work. The limit is probably thermal.
VA rating at max current is a short-circuit. If your load draws enough reactive power, the voltage and current get so far out-of-phase that a huge current sneaks through without much voltage. It could be many times as much current as the max current at max Watts.
That's what I thought you were saying, but that's not what I'm saying. There might never be enough local money to support it. But the regional or higher levels of government might think it's strategically important, or even profitable over a much wider area beyond local municipalities. For example, the USPS services rural areas where they lose money because it's considered important enough.
Any subject was already allowed before. What more could be allowed?
Here's a class on CRT from a few years ago. I can't see what good the bill would do here. But I can think of a lot of ways to harass people with it, or get the class cancelled out of fear of being sued or fired.
https://www.nerc.com/news/Pages/California-Mobility-Center,-...
Just like the grid adapted to the growing use of HVAC, it will have to adapt to the growing use of electric cars.
[1] https://californiamobilitycenter.org/latest-california-mobil...
I can't think of single a time where old code or tools were a barrier to innovation. We updated when there was a real need, but otherwise left working code alone to focus on adding innovative engineering features. The code was so heterogenous that it was modular by default, so the pain of one library's tooling was limited to that one library.
[1] https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20...
[2] https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20...
[3] https://cdn.misoenergy.org//Aligning%20Resource%20Availabili...
If NASA gets to the moon again, it'll be on a cheap ride they buy from SpaceX.
Then why would remaking the part be any better than redesigning the system?
As a general comment, you still jump to many exaggerated conclusions apparently without seeking to understand. For example, your conclusion about an elevated class of engineers that use magic, which you explicitly said is an assumption.
Having worked with these processes and techniques myself for many years in other industries, I know from daily firsthand experience that this is not at all a fair characterization. What they do is one piece of one layer of defense. One aspect of their job is to say no until they cannot say no anymore. The new techniques are for finding more things to say no about.
However, you erroneously concluded that they must be concocting new ways to justify increasingly risky behavior. If you still feel this to be true, the burden of proof has firmly shifted back to you, for the purpose of this discussion. To be clear, I don't expect you to trust me for the purpose of changing your own opinion.
I don't have time to address everything you've written. Maybe the next thing to reflect on is what out-of-spec truly means and implies. On one hand, you're afraid of cost pressure. But on the other hand, you want to create larger cost pressure through a rigid system of rules that you alone adhere to. Something to consider revisiting yourself.
As for general concerns about nuclear, I think the public messaging needs to improve before a real discussion can happen about accepting new developments. Old technologies and risks still dominate the psyche, and new technologies are varied with different concerns from each other.